General Site Prep Guide
Equipment & Accessories

Included for Installation

9min
this section lists items necessary for installation and initial training these items will need to be returned to carbon save all packaging as it will be needed to return equipment to carbon customer use the following items are provided by carbon to be used by the customer network configuration device used to test the customer network before installation and training can be scheduled packaged in cardboard box approximately 20 x 16 x 6 inches after use, ncd must be returned to carbon using the included fedex return shipping label \# item quantity 1 laptop computer 1 2 power adapter & cable 1 3 fedex return shipping label 1 remote familiarization training kit (optional) equipment used for remote training included if customer chooses remote familiarization packaged in pelican case approximately 16 5 x 11 x 6 inches after use, kit must be returned to carbon using the included fedex return shpping label \# item quantity 1 wi fi router 1 2 ethernet cable 1 3 wi fi camera 2 4 tablet 1 5 tripod 1 6 clamp 1 7 speaker 1 8 battery pack 1 9 fedex return shipping label 1 carbon use the following items are provided by carbon to be used by the carbon field service engineers (fses) these kits are currently for use with l1 printers only the kits below are provided at carbon’s discretion as an alternative to the onsite toolkit after use, items are returned to carbon by carbon field service engineers (fse) l1 install kit this kit is contained in a pelican case that is approximately 22 x 14 x 9 inches (56 x 36 x 23 cm) item l1 printer quantity tools and materials to support printer install 1 l1 transport kit this kit is contained in a pelican case that is approximately 30 x 20 x 12 inches (76 x 51 x 30 cm) item l1 printer quantity specialized tools for calibrating printers 1