Aligner Production Site Prep Guide

27min
Document image


Overview

This page will provide all of the information necessary to properly prepare your aligner production facility to receive Carbon products. Read through the information below to understand all of the requirements and recommendations for preparing your site to receive Carbon products.

  • Primary Site Prep Documents
    Download these important specification handouts to share with your facilities team.
  • Checklists
    Familiarize yourself with the appropriate site prep checklist to understand the requirements of the L1 Production Solution workflow.
  • Lab Design Download the sample lab layouts below and prepare a facility plan based on your space and goals. Make sure to share your layouts with our Site Prep team.

Primary Documents

Document image


Checklists

Use the documents below to track your progress as you prepare your facility. Choose the document that corresponds with your printer.



Lab Design

Document image


Layout Tool

Design your facility using this Powerpoint slide deck. Contains scale models of Carbon products and lab accessories.

Facility Cleanliness Guidelines

Follow these guidelines to minimize cassette damage and reduce the risk of contaminating the resin.

Facility Requirements

These documents provide detailed specifications so that you can prepare your facility to receive Carbon products. Share these with your facilities staff as soon as possible to have a smooth installation.

General Lab



L1 Printers



Accessories

Heinzen Spinner



Dreve PCU 90



Vac-U-Max Pump Vacuum



Release Film Remover



Carbon Approved Equipment



DPR 10 IBC Tote

Manuals

L1



L1 Cassette Cart



Heinzen Spinner



Vac-U-Max Resin Pump Vacuum



Drum Pump



Topaz Oxygen Concentrator



Polyscience Chiller



Nitrogen Consumption Calculator



Networking & Computers

Information on how to prepare your network for receiving Carbon products.



L1 Seismic Restraint Kit