Dental Site Prep Guide

Floor Space

2min
requirements it em m1/m2 printers m3 / m3 max printers printer dimensions (w x d x h) w 543 mm (21 4") d 655 mm (25 8") h 1733 mm (68 2") w 760 mm (30") d 696 mm (27 5") h 1762 mm (69 5") minimum clearances side s front f back b s 480 mm (18 9") f 480 mm (18 9") b 380 mm (15 0") s 240 mm (9 4") f 561 mm (22 1") b 380 mm (15") all minimum facilities connections must have 1 m (36") of slack recommended clearances side s front f back b s 240 mm (9 4") f 561 mm (22 1") b 610 mm (24") facility requirements docid\ qvbccaueszszatj588zq1 item all printers installation surface ff 25/fl 20 (moderately flat) hard, level, non porous, easily cleanable surface no carpet no foam tiles concrete must be sealed seismic anchors your facility may need seismic anchors to comply with local safety regulations if using seismic floor anchors, the floor must be sealed concrete rated to at least 20 5 mpa (3,000 psi) to learn more about seismic anchors for m1/m2 printers, product manual & technical drawings docid xztfx2pcmaizpvv d fd contact carbon for more information on seismic anchoring for m3 / m3 max printers carbon has seismic floor anchors available for purchase, contact your sales director or sales operations hvac requirements controlled environment humidity 30 60% humidity stability less than ± 5% change per hour temperature 18 24° c (64 75° f) temperature stability less than 2° c (3 8° f) change per hour location requirements (other) the printer should be placed far from vibration producing equipment extreme vibration (e g , near heavy machinery or train tracks) can cause print failures avoid such areas elevation your facility must be between 0 2000 m (0 6560 ft) for proper operation uv exposure limit uv exposure by placing printer, resin, and work areas away from windows and uv light sources recommendations led lighting is recommended nearby exterior windows should be coated to minimize transmission of wavelengths < 420 nm